4th Bal Basera was inaugurated by the President, CPWD-OWA, at Dr. B.D Marg Construction site, 6th March, 2019 (DELHI)

bullet
**4th Bal Basera** was inaugurated by the President, CPWD-OWA, at Dr. B.D Marg Construction site.
There are **27 children** in this creche. Refreshments were distributed to the children.